Saturday, March 20, 2010

Work Day 03.20.10

Thanks to all who surrendered their Saturday morning and worked so hard. Here are some of the things we completed. We...
  • Cleaned out the hallway behind the baptistery.
  • Started cleaning the counting room.
  • Quick-fixed a leaky pipe in the women's bathroom.
  • Raked the lawns to prepare for the first mowing.
  • Changed 8 outlets and 2 switches in the sanctuary. All outlets, switches and plates now match.
  • Installed hand railings at side-access stairs to the platform. Check out the shiny mounts.
  • Dismantled the wooden bench in the old youth room.
  • Installed a new threshhold at women's bathroom entrance.
  • Installed 4 carbon monoxide detectors. Each level of the building has a detector.

Details matter. We take care of details in our homes. Why should it not be so in God's House? Again, thanks to all the workers.

By the way...What happened to all the donuts?